Alpha-Numeric Key: | CK-400 |
Corporate Name: | W. S. Johnston (Johnson) and Ja. Crawford |
Local Name: | |
Owner Name: | W. S. Johnston (Johnson) and Ja. Crawford |
Location: | Unknown |
County: | Cherokee |
Years in Operation: | 1 year |
Start Year: | 1899 |
End Year: | 1899 |
Decades: | 1890-1899 |
Period of Operation: | 1899 |
Town: | Unknown |
Company Town: | 2 |
Peak Town Size: | Unknown |
Mill Pond: | |
Type of Mill: | Rough and finished lumber
Sawmill |
Pine Sawmill |
Hardwood Sawmill |
Cypress Sawmill |
Planer |
Planer Only |
Shingle |
Paper |
Plywood |
Cotton |
Grist |
Unknown |
Other |
|
|
|
|
Power Source: | Ames steam engine and boiler
Horse |
Mule |
Oxen |
Water |
Water Overshot |
Water Turbine |
Diesel |
Unknown |
Pit |
Steam |
Steam Circular |
Steam Band |
Gas |
Electricity |
Other |
|
|
Maximum Capacity: | |
Capacity Comments: | Unknown |
Produced: |
Rough Lumber |
Planed Lumber |
Crossties |
Timbers |
Lathe |
Ceiling |
Unknown |
Beading |
Flooring |
Paper |
Plywood |
Particle Board |
Treated |
Other |
| |
|
Equipment: | Right-hand Dixie #2 sawmill, two 42-inch head blocks, saw dogs, carriages, an edger, SH Goodall-Waters 6-inch by 24-inch single surfacer planer-matcher. |
Company Tram: | |
Associated Railroads: | Unknown |
Historicial Development: | W. S. Johnson [Johnston] and Ja. Crawford mortgaged with Dilley for $900 on April 20, 1899, pledging an Ames engine, an Ames 44-inch by 13-foot boiler, a SH Goodall-Waters single surfacer-matcher. W. S. Johnson [Johnston] and Ja. Crawford mortgaged with Dilley for $550 on June 3, 1899, pledging a right-hand Dixie #2 sawmill, two 42-inch head blocks, saw dogs, carriages, and an edger. W. S. Johnson [Johnston] and Ja. Crawford mortgaged with Tyler Machine Company for $313 on December 9, 1899, pledging a 6-inch by 24-inch single surfacer planer-matcher. |
Research Date: | MCJ 01-31-96 |
Prepared By: | M. Johnson |