Alpha-Numeric Key: | CK-93 |
Corporate Name: | C. S. Spurlin |
Local Name: | |
Owner Name: | C. S. Spurlin |
Location: | Unknown |
County: | Cherokee |
Years in Operation: | 3 years |
Start Year: | 1897 |
End Year: | 1899 |
Decades: | 1890-1899 |
Period of Operation: | 1897 to 1899 |
Town: | Unknown |
Company Town: | 2 |
Peak Town Size: | Unknown |
Mill Pond: | |
Type of Mill: | Rough and finished lumber
Sawmill |
Pine Sawmill |
Hardwood Sawmill |
Cypress Sawmill |
Planer |
Planer Only |
Shingle |
Paper |
Plywood |
Cotton |
Grist |
Unknown |
Other |
|
|
|
|
Power Source: | Two 35-horsepower Ames boilers
Horse |
Mule |
Oxen |
Water |
Water Overshot |
Water Turbine |
Diesel |
Unknown |
Pit |
Steam |
Steam Circular |
Steam Band |
Gas |
Electricity |
Other |
|
|
Maximum Capacity: | |
Capacity Comments: | Unknown |
Produced: |
Rough Lumber |
Planed Lumber |
Crossties |
Timbers |
Lathe |
Ceiling |
Unknown |
Beading |
Flooring |
Paper |
Plywood |
Particle Board |
Treated |
Other |
| |
|
Equipment: | #2 sawmill, a planer-matcher, three head blocks, a 24-foot carriage, and two 35-horsepower Ames boilers. |
Company Tram: | |
Associated Railroads: | Unknown |
Historicial Development: | Spurlin mortgaged with H. F. Smith in 1897 for $375, pledging a #2 sawmill, three head blocks, a 24-foot carriage, and two 35-horsepower Ames boilers. In 1898, Spurlin had added a planer-matcher. |
Research Date: | MCJ 01-25-96 |
Prepared By: | M. Johnson |